.::. LPG and LNG Tank .::.
•

VOLUMES;  45m³, 47m³, 48m³ ,50m³,55m³,57m³,62m³, 65m³

•

CHASSIS ; Strengthened “I” section centre members are welded automatically by submerged welding machine. They are welded between 120/12 mm bottom or top flat steel and 5 mm hub plate. These racks are supported by binding with axle beams against being twisted with each other

•

AXLE SHAFT ; 3 axle shafts with the capacity of 12 tons, are used. There are brake shoes and heavy brake levers suitable for TSE norms

•

SUSPENSION ; Parabolic double deck Z springs and dashpots

•

ELEVATING FRONT AXLE SHAFT ; Remote operated elevating system for front axle shaft in cabin

•

TIRES AND RIMS ; 385/65 R22,5 tires 6+1, 11,75 x 22,5 rims 6+1,

•

ELECTRICAL EQUIPMENT ; It is suitable for SAE standards and Tüv regulations. Electricity is provided by 7 pin plug from vehicle. There are necessary traffic advisory and stoplights on both sides. There are back lights, brake lights, license plate lamps, trailer reflectors and orange colored warning lights on the sides

 
•

 

BRAKE EQUIPMENT ; 71/320/ewg ff brake system according to EC standards. Automatic slacks, 4 spring brake chambers and 2 service brake chambers.  RSS that provides safe driving system against 2S / 2M EBS and rollover (Balance Control System). Air leaks in trailer are blocked by Sweden patented Ruffels union system

 
•

KING-PIN ; Steel king-pin which is 2” according to DIN 74080 standards and 3½” 42 CRMO4 according to DIN 74083 standards are used

•

LEGS ; Two speed, telescopic, mechanical conveyor legs, with the capacity of 24 tons

•

PAINT ; Rack and superstructure  are painted in paint drying oven by Washing + Sanding + 2+1 coat Acrylic

•

COLOR ; It will be specified according to customer request

•

STANDARD ACCESSORIES ; Multi-piece plastic fenders that covers trailing  axle tires. 1 plate unloading valve box. 1 plate tool box. 1 non-slip floor walking platform. 1  ladder (climbed from behind). 2 PVC pipes to carry unloading hoses. Control Panel(Mob, air clock, access ramp lever). Plastic water tank. Roller or basket stare tire conveyor. Aluminum bike impact absorber. Mounting and mounting space

•

OPERATION PRESURE ;17,5 BAR, TEST PRESURE 26,5 BAR , WORK HEAT min -20 ºC, max +49 ºC ,

•

CAP TYPE; Hemispherical Heads  Thickness of the  sheet  10 mm, DIAMETER 2600mm, TOTAL LENGTH 13.150 mm, BODY SHEET Thickness of the bombe sheet 12 mm, DESİGN CODE AD  2000 MAKBLATTER

•

MATERIAL; Product DIN EN 10025 - Part 2-1993 as standard Erdemir at S 355 hair is produced. For CE compliance of all experiments can be done under the supervision of Germanischer Lloyd is certified with a certificate C.3.1. This certificate along with documents submitted CUSTOMER delivery tank will be delivered.

•

TANK ACCESSORY ; excess flow valf 3” 1 pıece, excess flow valf 2” 2 pıeces, block flanges 3” 1 pıece, block flanges 2” 2 pıeces, hydaulıc operator  1 pıece, 2 “ hydaulıc valve 1 pıece, 3” hydaulıc valve 1 pıece, level ındıcator 1 pıece (rotagec), 2 “ safety valve 2 pıece

•

CONTROLS ; Material certification, welders documents, and hydrostatic testing company, will be done under the supervision of Germanischer LLOYD and inspection report will be given to buyer. If the buyer requests inspection of production processes, it will be done under supervision of Germanischer LLOYD inspection report will be given to buyer and will be extra cost to the buyer.

•

WELDINGS; All resources by welders certified welders to do with dust and full penetration welding will be provided. Source mouth DIN 8551 accordance with will open. Filling material resources DIN 1913, 8529 and 8557 are eligible to

•

HEAT TREATMENT ; Reduction of tension to be applied to backgammon Bombe and bombe depending on which way to change the voltage will be taken.

 

PAINTING; Blasting Quality : SA ½, 1 Layer Shop-Primer, 1 Layer Epoxy-Primer, 1 Layer Epoxy Final , All painting will be JOTUN brand.

•

FITTINGS PN40 nozzle pipes to be manufactured from materials certified as appropriate.Certified used equipment and installation of all flanges will be used. Materials and chemical analysis results of chance drawing will be taken from manufacturers..